|
|
The indipendent Checking of Structural Projects is an activity that the owners or the Main Contractor usually ask for special or large structures. This activity is generally required to professional subjects that have a recognized experience in design and construction of works of the same type and of equal or major importance.
A complete indipendent analysis of the conceptual, static, dynamic, and constructional aspects is required in this job. In many cases also a parallel control of the construction phases and of the job site activities is requested to the checker.
The so called "design validation" that according to the Italian laws is required to the RUP in Italian contracts, is a limited sub-set of the Indipendent Checking, being usually limited to checking the completeness of documents in order to allow the contract to be stated between owner and constructor.
The so called "Collaudo Statico", according to the Italian laws is a final official Certification of the correctness of the construction, and can include the activity of Indipendent Checking; anyway the extension of this job, if required, should be agreed between the owner and the Professional.
De Miranda Associati has expertise and qualification to perform activities of Certification, Validation and Indipendent Checker for special and large projects.
In recent years he performed these class of services for some special projects.
Among the others we can cite the following:
-
The Offices of "Il Sole 24 Ore"
-
Garibaldi Towers in Milan
-
The three bridges of the A1 motorway near Reggio Emilia
-
The Lingotto cable-stayed bridge in Turin
-
The cable-stayed bridges at the Santo Amaro Station
-
The
Roberto Marinho bridge, Brazil
-
The cable-stayed bridge over
the Rio Negro in Manaus, Brazil
Other works are
presently in progress.
|
Avenida do Estado cable-stayed bridge in San Paolo, Brazil
Trecho Santo Amaro cable-stayed bridge over Rio Pinheiros, Brazil
Highway bridge in Reggio Emilia - Central Arch Bridge
Highway cable-stayed bridges in Reggio Emilia - North Bridge and South Bridge, Italy
Pedestrian bridge at Olympic Village in Torino, Italy
Cable-stayed bridge “Jornalista Roberto Marinho” in San Paolo, Brazil
Cable-stayed bridge over rio Poty in Teresina, Brazil
Cable-stayed bridge over rio Negro in Manaus, Brazil
Cable-stayed bridge Padre Adelino in San Paolo, Brazil
"Il Sole 24 ore" new headquarters in Milano, Italy
Restructuring of Garibaldi Towers in Milano, Italy
|
|