News

Completion of Val di Pai Bridge! [VIDEO]

We are proud to announce that the construction of Cable Stayed Bridge in Val di Pai, Italian Alps, is now completed!

The deck has been assembled from the left side of the valley, where the concrete mast is anchored to the mountain, with a rhythm of one  segment completed every 10 days.

The construction method has been studied considering the minimum jobsite space, that had also an open road crossing the area: the whole deck construction has been carried out with a 55t mobile crane, that worked on the deck until a maximum cantilever of 106 meters.

Check the Drone video clip here below!

.